Project reference · 01
Aerial view of the completed infinity-edge pool wrapping the waterfront residence in Hollywood, Florida
Hollywood, Florida · Waterfront estate · Completed August 2026

A 177-foot pool that ends in the water

A free-form infinity pool built on 51 helical piles at the tip of a peninsula lot, finished entirely in emerald porcelain, and delivered as a subcontractor to the general contractor in under six months from dig to final inspection.

1,773SFWater surface
32,750galPool volume
78LFVanishing edge over the water
51Helical piles under pool and basin
The brief

Make the pool disappear into the Intracoastal

The residence sits on a narrow peninsula with water on three sides. The owner and the general contractor, Buss Construction Services, wanted a pool that would read as an extension of the waterway: a long, free-form body of water with a vanishing edge along the entire north-east side, a dry lounge sunk into the pool, and a single dark-green material running from the floor of the pool up over the coping.

Liberty Pools was brought in as the pool subcontractor. Our scope ran from engineering and permitting with the City of Hollywood through structure, waterproofing, tile, equipment and start-up, coordinated week by week with the GC's own trades on site.

Design & engineering

Built for soft ground and salt air

The geotechnical report ruled out a conventional slab-on-grade shell. The pool, the 85-foot collection basin and the dry lounge all sit on 51 helical piles rated at 12 tons in compression, tied into a shell poured at 6,000 PSI with 10-inch walls and a 12-inch floor on double-layer #5 rebar. Because the site is in flood zone AE, the shell carries hydrostatic relief and the plans were sealed for the city's structural review.

The water feature is a true vanishing edge, not a spillway: 78 linear feet of wall drop into a gutter and an 85-foot basin with its own pump, filter, channel drain and autofill, feeding four dedicated return lines so the sheet of water stays continuous in wind.

Approved pool plan sheet from the City of Hollywood showing the free-form pool, basin and pile layout

Sheet 1 of 4, approved 03/04/2026. Sealed engineering plans reviewed and stamped by the City of Hollywood building department.

Pool size
46'-5" × 53'-10" free form, 4' to 4'-6" deep
Perimeter
177 LF, plus 162 LF basin
Structure
6,000 PSI shotcrete, 10" walls, 12" floor
Foundation
51 helical piles, 12 T compression
Finish
3,500 SF emerald green porcelain tile
Coping
190 LF infinity coping, shellstone and travertine
Lighting
16 nicheless LED, LED strip on entry step and full gutter edge
Hydraulics
12 returns, 3 channel drains, mechanical autofill
The build

March to August, one inspection at a time

Every milestone below was scheduled, photographed and inspected through our project-management system. The owner and the GC could follow each stage from their phones.

Top-down drone view of the finished concrete shell on the peninsula lot
Mar 4 – Mar 24

Piles, steel, shotcrete

Dig day March 4. Steel and bonding inspected March 16, shell shot by March 24.

Project manager and superintendent reviewing plans on the cured shell
Mar 25 – Apr 24

Plumbing & bond

Perimeter plumbing passed April 1; equipotential bond passed April 24.

Tile setter installing emerald porcelain tile on the pool floor
May 7 – Jun 27

Waterproofing & tile

Seven weeks to set 3,500 SF of porcelain over a full LATICRETE membrane system.

Pool equipment pad with Jandy pumps, filters and heat pumps
Jun 22 – Jul 9

Equipment & fill

Two variable-speed pumps, automation, salt systems and heaters set; pool filled July 3.

Mason setting travertine coping on the raised wall
Jul 13 – Aug 29

Deck & final

Coping and deck complete August 15. Electrical, deck, barrier and city finals passed by August 29.

Craft

One material, floor to edge

Close view of emerald porcelain tile being set on the pool floor

Porcelain in the water

A full-tile interior is rare in South Florida. The shell was prepped, coated twice with HydroBan and fabric at every transition, then tiled with 254 Platinum and epoxy grout so the finish holds up to salt water for decades.

Drone view straight down onto the tiled pool floor and infinity gutter

The edge detail

The vanishing wall was ground and levelled to a single line over 78 feet, then wrapped in tile and finished with an LED strip along the full gutter edge so the sheet of water reads at night.

Glass-walled residence seen from the pool deck during construction

Dry lounge and stairs

A 16' × 13' dry lounge sunk into the pool, finished in sandblasted emerald marble on floor, edge and wall, with six 8-inch risers carrying guests down into the water.

Challenges & solutions

What the site threw at us

Challenge

Fill soil on a waterfront peninsula, inside flood zone AE. A standard shell would settle and crack.

Solution

Soil report before design, then 51 helical piles under pool, basin and lounge, with existing piles located and tied in. No settlement, no cost surprises during excavation.

Challenge

Only a 5-foot side access to the back of the lot for machinery.

Solution

Excavation with a compact Bobcat in a 7-foot working lane. All excavated material was reused as fill on site, so no truck convoy through the neighborhood.

Challenge

The landscape architect raised the retaining wall and the landing after the shell was shot.

Solution

Beam and entry steps were raised with new rebar to meet the new elevations, priced as a change order and built without pushing the schedule.

Challenge

Tiling an entire pool interior with porcelain, a finish that fails if the waterproofing is even slightly wrong.

Solution

A written, step-by-step LATICRETE specification in the contract, a dedicated tile crew for seven weeks, and coordination with the GC's electrician for the LED runs.

On site

The project manager walks the job

Rafael, Liberty Pools' project manager on Southlake, on what has to be right before anyone digs a waterfront pool. Every Liberty project has one PM from permit to pool school.

Tap to play. Recorded on site in July 2026.

The result

Finished, filled, and handed over

Aerial view of the completed pool along the waterfront with the modern residence behind it
View across the infinity edge to the water and the skyline beyond
Top-down drone view of the finished pool, lounge and deck
Drone view of the pool edge meeting the seawall

Pool school with the owner completed September 8, 2026. A second Liberty crew is now setting 5,800 SF of granite driveway and 3,500 SF of travertine decking on the same property.

For Kolter Homes

What this project proves

We work under a GC

Southlake was delivered as a subcontractor to Buss Construction: their schedule, their site rules, their electrician. We are used to being one trade among many.

We engineer, not just dig

Sealed plans, geotechnical-driven foundations, a hydrostatic-relief shell and seven passed municipal inspections on a difficult waterfront lot.

We finish on a calendar

Dig to final city inspection in under six months on a 32,750-gallon infinity pool, with every stage logged and visible to the client.